ZALMAN CNPS9300 AT Especificaciones Pagina 6

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 8
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 5
*
The specifications of any product may change without prior notice to improve performance.
5
2) AMD Socket AM2+/AM2/754/939/940
Thermal Grease Application
Clear off particles and any residue from the top
of the CPU then spread an adequate amount
of the included Thermal Grease(
) on the
CPU surface thoroughly.
Clip Installation
Refer to “Clip Installation Depending on the Orientation of the Retention Frame” on page 3 to
correctly install the Clip(
) according to the orientation of the Retention Frame.
Cooler Installation
Insert the Clip Lever(
) into the Groove for AMD of Clip(
). Align and connect the Clip’s
Lug Slot with the Lug of the motherboard’s Retention Frame. Press onto the Clip Lever when
aligning the Lever’s Lug Slot with the Lug.
CPU(Lid)
Thermal Grease
Clip’s Lug Slot
Clip,
Groove for Intel
Groove for AMD
Lug
Lever’s Lug Slot
Clip Lever,
Lug
Clip Lever,
Clip,
Lug
Groove for Intel
Groove for AMD
Clip’s Lug Slot
Arrow marked Lug
b. When using Clip(
)
Refer to
Clip Installation Depending on the Orientation of the Retention Frame
on page
3 to correctly install the Clip(
) according to the orientation of the Retention Frame.
Insert the Clip Lever(
) into the Groove for Intel of Clip(
). Align and connect the Clip's
Lug Slot with the Arrow Marked Lug of the Clip Support for Socket 775. Press onto the
Clip Lever when Aligning the Lever’s Lug Slot with the Lug. Make sure that the cooler is
installed on the center of the CPU.
Vista de pagina 5
1 2 3 4 5 6 7 8

Comentarios a estos manuales

Sin comentarios